CPS HR Consulting

The New York City Department of Buildings

Master Rigger License

This page contains information specific to the Master Rigger License Exam

For information on another other trade exam, please return to the Home Page:

Home

General scheduling and examination information can be found at Scheduling & Taking your Exam:

Scheduling & Taking your Exam

Information on testing accommodations can be found under Reasonable Accomodations:

Reasonable Accomodations

for any other information, please follow the appropriate trade link under Obtain your License:

Obtain Your License

Scope of the Master Rigger Written Examination

The examination assesses a candidate’s knowledge of and experience in applying the relevant portions of the NYC Codes, Rules and Regulations, as well as trade-specific industry knowledge. This knowledge of rigging and the risks associated with such work includes, but is not limited to, the safety precautions that must be taken (i.e., safety loads and computations), types of rigging, size and strength of ropes, cables, blocks, poles, derricks, shear legs and other tools used during such work.

Content Outline

Master Rigger Written Examination

Number of Questions Minimum Passing Score
Time Allowed
75 53 (70%) 3 hours

Master Rigger License

Scoring of Practical Examination

The exercises are grouped into sections. To pass, you must score 70% or higher overall and pass all critical exercise(s).

Your practical examination score report will be sent to you via U.S. Mail within four (4) to six (6) weeks of the date of your examination.

CPS HR’s goal is to provide quality examinations and a pleasant testing experience for candidates. If you are dissatisfied with either and believe CPS HR can correct the problem, please use the comment forms available during your written examination administration. Your comments will be reviewed by CPS HR.

If you fail the written examination by five (5) percentage points or fewer, you may submit an appeal. The appeal must state the title of the license examination, your name, return address, the date of the test, and a detailed statement of the grounds for appeal. Your appeal must be received no later than thirty (30) days from the date of notification of failure to pass the license examination. An appeal form can be found at the FAQ section of the CPS HR website: https://link.cpshr.us/DOBAppealForm

Please review and fill out the Written and Practical Examination Appeal form. Submit your appeal to CPS HR Consulting at [email protected] using the same email address provided to NYC DOB on your LIC41 (https://www1.nyc.gov/assets/buildings/pdf/lic41.pdf).

Subject Area Number of Items References
Cranes and Derricks 30  
General Code Requirements 8 NYC BC, Section 3319; RCNY 3319-01; RCNY 10; IPT, Sections 1, 10
Inspections and Specifications 22 RCNY 3319-01; IPT, Sections 4, 10
Rigging 30  
Material Handling Equipment 8 NYC BC, Section 3320; IPT, Sections 1, 6, 10
Rigging Operations 17 NYC BC, Section 3301; NYC BC, Section 3303; RCNY 3319-01; RCNY 104-20; IPT, Sections 1, 2, 4, 10
Hoisting Equipment 4 NYC BC, Section 3316; RCNY 3319-01; RCNY 10; IPT, Section 1, 4, 10
Material and Bucket Hoists 1 NYC BC, Section 3317
Scaffolding 15  
Code Compliance 3 NYC BC, Section 3314; RCNY 104-20, Fact Sheet – IRA
Design and Adherence 3 NYC BC, Section 3314
Installation and Use 4 NYC BC, Section 3314
Industrial Rope Access 1 Fact Sheet – IRA, NYC BC, Section 3316
Suspended Scaffold 4 NYC BC, Section 3314
Note: NYC BC = NYC Construction Codes: Building Code. RCNY = Rules of the City of New York. Fact Sheet = NYC Department of Buildings, Fact Sheet. IPT = IPT’s Crane and Rigging Handbook (2005).
  • Chapter 1: Administration
  • Chapter 4: Licensing and Registration of Businesses, Trades and Occupations Engaged in Building Work
  • Section 3301: General
  • Section 3303: Safeguards and Maintenance of Site
  • Section 3314: Scaffolds
  • Section 3316: Hoisting Equipment
  • Section 3317: Material Hoists and Bucket Hoists
  • Section 3319: Cranes and Derricks
  • Section 3320: Material Handling Equipment
  • Chapter 3300 Section 3319-01: Safeguards during Construction or Demolition-Cranes and Derricks
  • Chapter 10: Drums for Derrick Load and Boom Hoists
  • Chapter 100: Administration; §104-20, Supervisory Responsibilities of a Licensed Rigger
  • Chapter 3300: Safeguards During Construction or Demolition; §3310-01 Site Safety
  • Industrial Rope Access: Application Procedures for Façade Inspections and Investigation

Appealing Examination Results

CPS HR’s goal is to provide quality examinations and a pleasant testing experience for candidates. If you are dissatisfied with either and believe CPS HR can correct the problem, please use the comment forms available during your written examination administration or following your practical examination. Your comments will be reviewed by CPS HR.

If you fail the written examination by not more than five (5) percentage points or by only one section of the practical exam, you may submit an appeal. The appeal must state the title of the license examination, your name, return address, the date of the test, and a detailed statement of the grounds for appeal. Your appeal must be received no later than thirty (30) days from the date of notification of failure to pass the license examination. An appeal form can be found on the documents page.

Please review and fill out the Written and Practical Examination Appeal form. Submit your appeal to CPS HR Consulting at [email protected] using the same email address provided to NYC DOB on your
LIC41 (https://www1.nyc.gov/assets/buildings/pdf/lic41.pdf)
or LIC42 (https://www1.nyc.gov/assets/buildings/pdf/lic42.pdf).