Master Plumber License
For general exam information see the submenu above.
Materials and Equipment Required for Taking Practical Examination
Test Description
Applicants will be required to produce two work specimens:
- Black Steel Piping Assembly:
- Copper Sweat Assembly:
Candidates are Required to Bring the Following:
Black Steel Piping Assembly
- [10 feet] – ¾” Black steel pipe, must be unimproved pipe in lengths no shorter than 36”
- [4] – ¾” Black nipple sets (any size in any denominations up to 6”)
- [1] – ¾” Black malleable 90°
- [3] – ¾” Black malleable tees
- [4] – ¾” Black malleable 45°
- [1] – ¾” Black malleable union
- [1] – ¾” Steel flange set with nuts, bolts, and gasket material
- [1] – ¾” Left/right nipple with coupling
Copper Sweat Assembly
- [1] – Roll groover with machine
- [3 feet] – 3” Type L Copper Tubing, must be a single length of unimproved tubing
- [1 foot] – 1 ½” Type L Copper Tubing
- [1] – 3” Copper x Copper Coupling
- [1] – Mechanical Coupling for 3” copper pipe
- [1] – Mechanical Cap for 3” copper pipe
- [1] – 3” X 1 ½” Copper Reduction Coupling
- [1] – 1 ½” x ½” Copper Reducer Coupling
- [1] – ½” Copper female street adapter (½” male x ½” female I.P.S)
The following materials are required to connect your specimens to the compressed air manifold:
- [4] – ½” Black nipples 4″ to 6″ long
- [1] – ½” Black malleable elbow
- [1] – ½” Black malleable union
- [2] – ½” ISP Ball valves
- [1] – ¾” by ½” malleable reducing coupling
Tools:
- B-Tank with regulator, hose, a set of gauges, a Prestolite torch with required tips, and/or a Turbo torch (any brand is acceptable)
- Tubing/pipe cutter with reamer to accommodate 1″ tubing and ¾” pipe
- Flux, sufficient lead-free solder
- Tripod vise
- ¾” ratchet stock
- Pipe cutter and cutting oil
- Pipe wrenches
- Swaging tool
- All required pipe wrenches and pipe joint compound
- Rainbow gasket material,as needed to fabricate a gasket on site
- Safety equipment as required by OSHA, including but not limited to safety goggles and work gloves
- Tubing cutter for up to and including 3″ copper tubing
- Hacksaw
- Half-round file to ream the 3” copper tubing piece
- Clamp-on bench vise
- Emery cloth and/or sand cloth and/or a scratch pad and a wire brush
- Calculator
- Yellow or White Roller ball paint marker (no silver)
- Adjustable wrench
- Tubing cutter
****Substitution of fittings or materials with items other than those specified may result in failure. Tools must be manually operated. Candidates may also elect to use hand-held battery-powered tools but are advised that no charging facilities will be provided at any point during the examination. Further, no scoring allowance will be made for malfunctioning or inoperable tools.****
NOTICE: Use of a hammer, mallet, or similar tool/object is prohibited on the Black Steel Pipe Assembly itself (e.g., a hammer can be used to create a gasket). Any candidate seen using a hammer, mallet, or similar tool/object on the Black Steel Pipe Assembly will fail the Alignment criteria.
Content Outline
The content outline for the New York City Master Plumber Written Examination is provided below. The examination is closed book and contains 100 multiple-choice questions. The outline lists all topics covered in the examination and the number of questions asked about each topic.
Scope of Written Examination
The examination will assess a candidate’s knowledge of and experience in applying the relative portions of the NYC Codes, Rules and Regulations, as well as trade specific industry knowledge.
Master Plumber Written Examination
| Number of Questions | Minimum Passing Score |
Time Allowed |
| 100 | 70 (70%) | 4 hours |
| Subject Area | Number of Items | References |
| Drainage | 21 | |
| Installation | 2 | NYC PC Ch. 3 |
| Maintenance | 2 | NYC PC Ch. 3, NYC PC Ch. 7 |
| Inspection Requirements | 3 | NYC PC Ch. 1 |
| Permits | 2 | NYC PC Ch. 1, NYC ADC Ch. 1, NYC BC Appendix G |
| Indirect/Special Waste | 1 | NYC PC Ch. 3, NYC PC Ch. 8 |
| Sanitary Drainage | 4 | NYC PC Ch. 3, NYC PC Ch. 6, NYC PC Ch. 7, NYC FGC Ch. 3 |
| Storm Drainage | 3 | NYC PC Ch. 3, NYC PC Ch. 11 |
| Vents | 4 | NYC PC Ch. 9 |
| Equipment | 23 | |
| Installation (Equipment) | 2 | NYC PC Ch. 3, NYC PC Ch. 4, NYC ADC Ch. 2, NYC ADC Ch. 3 |
| Maintenance (Equipment) | 1 | NYC PC Ch. 3, NYC PC Ch. 6 |
| Inspection Requirements (Equipment | 2 | NYC PC Ch. 1, NYC PC Ch. 3 |
| Permits (Equipment) | 2 | NYC PC Ch. 1 |
| Materials (Equipment) | 2 | NYC PC Ch. 3, NYC PC Ch. 7 |
| Limited Alterations | 2 | NYC ADC Ch. 1, NYC BC Ch. 1 |
| Applicability | 3 | NYC PC Ch. 1 |
| Fixtures, Faucets, and Fittings | 4 | NYC PC Ch. 4, NYC PC Ch. 6, NYC PC Ch. 8 |
| Sizing | 2 | NYC PC Ch. 6, NYC PC Appendix E |
| Special Piping and Storage | 2 | NYC PC Ch. 12 |
| Traps | 1 | NYC PC Ch. 10 |
| Gas Piping | 29 | |
| Installation (Gas) | 3 | NYC FGC Ch. 1, NYC FGC Ch. 4 |
| Maintenance (Gas) | 3 | NYC FGC Ch. 4, NYC ADC Ch. 3 |
| Inspection Requirements (Gas) | 3 | NYC FGC Ch. 1, NYC FGC Ch. 4, NYC ADC Ch. 3 |
| Permits (Gas) | 3 | NYC PC Ch. 1, NYC FGC Ch. 1, NYC ADC Ch. 1 |
| Materials (Gas) | 3 | NYC FGC Ch. 4 |
| Sizing (Gas) | 3 | NYC PC Ch. 8, NYC FGC Ch. 4 |
| Gas Appliances | 3 | NYC PC Ch. 5, NYC PC Ch. 6 |
| Drips and Sloped Piping | 1 | NYC FGC Ch. 4 |
| Flow Controls | 2 | NYC FGC Ch. 4 |
| Piping Support/Systems | 3 | NYC FGC Ch. 1, NYC FGC Ch. 4 |
| Shut-off Valves | 2 | NYC FGC Ch. 4 |
| Water Supply | 17 | |
| Installation (Water) | 3 | NYC PC Ch. 6 |
| Maintenance (Water) | 2 | NYC PC Ch. 3 |
| Inspection Requirements (Water) | 2 | NYC PC Ch. 1, NYC PC Ch. 3 |
| Permits (Water) | 3 | NYC PC Ch. 1, NYC ADC Ch. 1 |
| Water Recycling Systems | 3 | NYC PC Ch. 13 |
| Water Distribution | 4 | NYC PC Ch. 3, NYC PC Ch. 4, NYC PC Ch. 6 |
| Fire Protection | 10 | |
| Standpipe and Sprinkler Installation | 3 | NYC BC Appendix Q |
| Standpipe and Sprinkler Maintenance | 3 | NYC BC Ch. 33, NYC BC Appendix Q |
| Inspection Requirements (Fire) | 2 | NYC BC Appendix Q |
| Permits (Fire) | 2 | NYC ADC Ch. 1 |
| NYC ADC = NYC Administrative Code. NYC BC = NYC Construction Codes: Building Code. NYC FGC = NYC Construction Codes: Fuel Gas Code. NYC PC = NYC Constructions Codes: Plumbing Code. |
||
The content outline for the New York City Master Plumber Practical Examination is provided below. The examination is divided into two parts. The outline lists all topics covered in the examination.
Scope of Practical Examination
The examination will assess a candidate’s skill in applying the relative portions of the NYC Codes, Rules and Regulations, as well as trade-specific industry knowledge.
Master Plumber Practical Examination
| Examination Parts | Topic | Time Allowed |
| Part 1 | Black Steel Piping Assembly | 4 hours |
| Part 2 | Copper Sweat Assembly – Vertical |
Reference List
The reference list provided below includes suggested materials that could assist you in preparing for the examination. The examination questions reference NYC Codes, Rules and Regulations. Please note that the references below may cite portions of other codes, rules, or regulations. You may be tested on information in these additional sources that are applicable to your trade. The knowledge that will be tested in the examinations will be taken from these materials in addition to applied field knowledge of the Master Plumber trade.
This is not an open book examination; candidates are not allowed to bring reference materials into the testing site.
| Reference | Link |
| 2022 NYC Administrative Code, Title 28, Chapter 1: Administration; Chapter 2: Enforcement; Chapter 3: Maintenance of Buildings. | https://www1.nyc.gov/site/buildings/codes/codes.page |
| 2022 NYC Construction Codes: Building Code, Chapter 1: Administration; Chapter 33: Safeguards During Construction or Demolition; Appendix G: Flood-Resistant Construction; Appendix Q: Modified National Standards for Automatic Sprinkler, Standpipe, Fire Pump, Fire Alarm, and Smoke Control Systems, New York City Store, Order Department, One Centre Street, Room 2223, New York City, NY 10007. | https://www1.nyc.gov/site/buildings/codes/codes.page |
| 2022 NYC Construction Codes: Fuel Gas Code, Chapter 1: Administration; Chapter 3: General Regulations; Chapter 4: Gas Piping Installations, New York City Store, Order Department, One Centre Street, Room 2223, New York City, NY 10007. | https://www1.nyc.gov/site/buildings/codes/codes.page |
| 2022 NYC Construction Codes: Plumbing Code, Chapter 1: Administration; Chapter 3: General Regulations; Chapter 4: Fixtures‚ Faucets and Fixture Fittings; Chapter 5: Water Heaters; Chapter 6: Water Supply and Distribution; Chapter 7: Sanitary Drainage; Chapter 8: Indirect/Special Waste; Chapter 9: Vents; Chapter 10: Traps‚ Interceptors and Separators; Chapter 11: Storm Drainage; Chapter 12: Special Piping and Storage Sys. | https://www1.nyc.gov/site/buildings/codes/codes.page |
Appealing Examination ResultsCPS HR’s goal is to provide quality examinations and a pleasant testing experience for candidates. If you are dissatisfied with either and believe CPS HR can correct the problem, please use the comment forms available during your written examination administration or following your practical examination. Your comments will be reviewed by CPS HR. If you fail the written examination by not more than five (5) percentage points or by only one section of the practical exam, you may submit an appeal. The appeal must state the title of the license examination, your name, return address, the date of the test, and a detailed statement of the grounds for appeal. Your appeal must be received no later than thirty (30) days from the date of notification of failure to pass the license examination. An appeal form can be found at the CPS HR website: https://link.cpshr.us/DOBAppealForm . |